Standard Details express typical University requirements, and thus should be used in place of the equivalent A/E detail. Professional judgment is required to make Standard Details project specific.
To filter to these specific sections type the appropriate section into the Search bar below (i.e. 9.0, 9.1, 9.2, etc.)
9.0 - General Details
9.1 - Architectural Details
9.2 - Mechanical Details
9.3 - Electrica Details
9.4 - Site/Civil Details - See UM AEC Site/Civil Details
9.5 - Interior Design Details
9.6 - Construction Services Details - These details are for projects managed by Construction Services Details
(Click here to report a broken or missing link)